SIPS Construction Team

The SIPS phase of this build is now complete. Photo shows Duane Byrnes, Chris and Michael from Eco Smart Construction Ltd who did a great job putting up the SIPS structure.

First Floor

Inside view of the first floor with the dormer cheeks lined up ready to be installed,

Wednesday, 19 June 2013

The Pre-rendered Long Back Wall of the Garage

The 12m long back wall of the garage which had already been rendered and finished has been successfully lifted into its proper position.